
Unreeling HIHTL at S-Farm, Hanford, WA.

2″ x 4″ HIHTL being installed 12″ below grade. 2″ steel plate installed on top of hose for radiation shielding and protection from vehicles.

Installing >500′ HIHTL at Hanford, WA.

HIHTL installed below grade to accommodate road.

HIHTL installed under 2″ steel plate and entering below grade concrete pump pit.

Concrete shielding designed and fabricated by RBTS being installed over 2″ x 4″ HIHTL. Concrete shielding provides both radiation shielding and protection from vehicles.

Concrete shielding being installed on 1800′ long HIHTL.

2400′ HIHTL being installed between K-east and K-west Basins at 100-K area, Hanford, WA.

HIHTL INSTALLATION AT FUKUSHIMA (NOTE DAMAGED UNIT #4 REACTOR IN THE BACKGROUND)

HIHTL Fukushima Installation

HIHTL AT DOE’s SAVANNAH RIVER SITE

HIHTL AT DOE’s SAVANNAH RIVER SITE

HIHTLs FOR HANFORD’S K-BASIN SLUDGE RETRIEVAL PROJECT