![HIHTL Hanford Installation](http://riverbendtransfer.com/wp-content/uploads/2013/05/layingpipe1-300x180.jpg)
Unreeling HIHTL at S-Farm, Hanford, WA.
![hoseplates](http://riverbendtransfer.com/wp-content/uploads/2013/07/hoseplates-300x200.jpg)
2″ x 4″ HIHTL being installed 12″ below grade. 2″ steel plate installed on top of hose for radiation shielding and protection from vehicles.
![hose plates 2](http://riverbendtransfer.com/wp-content/uploads/2013/07/hose-plates-2-300x181.jpg)
Installing >500′ HIHTL at Hanford, WA.
![hose under road](http://riverbendtransfer.com/wp-content/uploads/2013/07/hose-under-road-300x238.jpg)
HIHTL installed below grade to accommodate road.
![hose plates 3](http://riverbendtransfer.com/wp-content/uploads/2013/07/hose-plates-3-200x300.jpg)
HIHTL installed under 2″ steel plate and entering below grade concrete pump pit.
![install_013](http://riverbendtransfer.com/wp-content/uploads/2013/05/install_0131-300x225.jpg)
Concrete shielding designed and fabricated by RBTS being installed over 2″ x 4″ HIHTL. Concrete shielding provides both radiation shielding and protection from vehicles.
![install_010](http://riverbendtransfer.com/wp-content/uploads/2013/05/install_010-300x225.jpg)
Concrete shielding being installed on 1800′ long HIHTL.
![k-basin snake](http://riverbendtransfer.com/wp-content/uploads/2013/07/k-basin-snake.png)
2400′ HIHTL being installed between K-east and K-west Basins at 100-K area, Hanford, WA.
![3 HIH and Unit 4](http://riverbendtransfer.com/wp-content/uploads/2013/07/3-HIH-and-Unit-41-300x225.jpg)
HIHTL INSTALLATION AT FUKUSHIMA (NOTE DAMAGED UNIT #4 REACTOR IN THE BACKGROUND)
![HIHTL Fukushima Installation](http://riverbendtransfer.com/wp-content/uploads/2013/07/CIMG0903-300x225.jpg)
HIHTL Fukushima Installation
![HIHTL AT SRS](http://riverbendtransfer.com/wp-content/uploads/2013/07/Picture1-300x224.jpg)
HIHTL AT DOE’s SAVANNAH RIVER SITE
![HIHTL AT SRS](http://riverbendtransfer.com/wp-content/uploads/2013/07/HoseRoute-300x236.png)
HIHTL AT DOE’s SAVANNAH RIVER SITE
![Back Camera](http://riverbendtransfer.com/wp-content/uploads/2013/05/IMG_0309-300x224.jpg)
HIHTLs FOR HANFORD’S K-BASIN SLUDGE RETRIEVAL PROJECT