HIHTL Installations

HIHTL Hanford Installation

Unreeling HIHTL at S-Farm, Hanford, WA.

hoseplates

2″ x 4″ HIHTL being installed 12″ below grade. 2″ steel plate installed on top of hose for radiation shielding and protection from vehicles.

hose plates 2

Installing >500′ HIHTL at Hanford, WA.

hose under road

HIHTL installed below grade to accommodate road.

hose plates 3

HIHTL installed under 2″ steel plate and entering below grade concrete pump pit.

install_013

Concrete shielding designed and fabricated by RBTS being installed over 2″ x 4″ HIHTL. Concrete shielding provides both radiation shielding and protection from vehicles.

install_010

Concrete shielding being installed on 1800′ long HIHTL.

 

k-basin snake

2400′ HIHTL being installed between K-east and K-west Basins at 100-K area, Hanford, WA.

 

3 HIH and Unit 4

HIHTL INSTALLATION AT FUKUSHIMA (NOTE DAMAGED UNIT #4 REACTOR IN THE BACKGROUND)

HIHTL Fukushima Installation

HIHTL Fukushima Installation

 

HIHTL AT SRS

HIHTL AT DOE’s SAVANNAH RIVER SITE

 

HIHTL AT SRS

HIHTL AT DOE’s SAVANNAH RIVER SITE

Back Camera

HIHTLs FOR HANFORD’S K-BASIN SLUDGE RETRIEVAL PROJECT