Hose In Hose Transfer Line Installations

Fig. 1 - Unreeling HIHTL at S-Farm, Hanford, WA.

Fig. 2 - 2" x 4" HIHTL being installed 12" below grade. 2" steel
plate installed on top of hose for radiation shielding and protection from vehicles.

Fig. 3 - Installing >500' HIHTL at Hanford, WA.

Fig. 4 - HIHTL installed below grade to accommodate road.

Fig. 5 - HIHTL installed under 2" steel plate and entering below grade
concrete pump pit.

Fig. 6 - Concrete shielding designed and fabricated by RBTS being
installed over 2" x 4" HIHTL. Concrete shielding provides both radiation
shielding and protection from vehicles.

Fig. 7 - Concrete shielding being installed on 1800' long HIHTL.

Fig. 8 - 1 1/4" x 4" x 2400' HIHTL being installed between K-east and
K-west Basins at 100-K area, Hanford, WA.